Used 2018 BMW M4
Stock: UA49419AVIN: WBS4Z9C50JED22835
- UA49419A
- Stock
- WBS4Z9C50JED22835
- VIN
- 29,229
- Miles
- Convertible
- Body
- RWD
- Drivetrain
- Silverstone Metallic
- Exterior
- Black
- Interior
- 110.7
- Wheelbase
- 3.0L 6-Cylinder Turbocharged DOHC
- Engine
- Gas
- Fuel
- 7-Speed Automatic
- Transmission
- 2
- Doors
- 22*
- Highway MPG (EPA estimate)
- 16*
- City MPG (EPA estimate)
3.0L Twin-Turbocharged Inline-6 Engine
7-Speed M Double-Clutch Transmission with Drivelogic
Silverstone Metallic Exterior
Black Extended Merino Leather Interior
Executive Package
19 M Forged Double-Spoke Style 437M Wheels
Adaptive M Suspension
Electro-Mechanical Limited Slip Differential
Head-Up Display
Icon Adaptive Full LED Headlights
Active Driving Assistant
Side & Top View Cameras
Park Distance Control
Parking Assistant
Apple CarPlay Compatibility
Harman/Kardon Surround Sound System
Heated Front Sport Bucket Seats
Navigation System with Advanced Real-Time Traffic Information
Carbon Fiber Interior Trim
Power Retractable Hardtop
Comfort Access Keyless Entry
Dual Zone Automatic Climate Control
MOTORCARS OF ATLANTA
7865 Roswell Rd
Atlanta, Georgia 30350
404.233.4269
Apple CarPlay
Bluetooth®
Brake Assist
CD Player
Heated Seats
Heated Side Mirrors
Keyless Entry
Memory Seats
Navigation
Parking Assist
Power Seat
Power Windows
Rain Sensing Wipers
Rear Air Conditioning
Rear Heated Seats
Rearview Camera
Satellite Radio
Security System
Side-Impact Air Bags
Stability Control
* Pricing - All vehicle pricing shown is assumed to be correct and accurate. Incentives, credit restrictions, qualifying programs, residency, and fees may raise, lower, or otherwise augment monthly payments. Additionally, incentives offered by the manufacturer are subject to change and may fluctuate or differ based on region and other considerations. Unless otherwise noted or specified, pricing shown does not include title, registration, or tax fees and costs.
* MPG - Vehicle information, as well as features and other inclusions, may vary by model and are based exclusively on standard equipment. No claims, warranties, or guarantees have been made related to the accuracy of customer payments, model equipment, or vehicle pricing. Please call with any questions you might have and to reassert the accuracy of any information presented here.
IMPORTANT PRICING & DISCLOSURE INFORMATION: All-In Pricing: In accordance with the Georgia Fair Business Practices Act, the displayed price for each vehicle on this website is the total cash price, which includes Documentation Fee and Electronic Filing Fee. It also includes any dealer-installed accessories or options already affixed to the vehicle. The only items strictly excluded from the advertised price are government-mandated charges: Georgia Title Ad Valorem Tax (TAVT), Tag & Title Registration Fees, and Georgia Lemon Law Fee. Pricing may include manufacturer rebates and incentives available to the general public. Unless explicitly stated, conditional offers (such as College Graduate, Military, or First Responder rebates) are not included in the advertised price and may be applied at the time of sale for qualified buyers. While we strive for accuracy, errors may occur. We reserve the right to correct any typographical errors. All vehicles are subject to prior sale. Please confirm all pricing and vehicle availability directly with the dealership.












